Of course you know we are nowhere near to being done with all the work that needs to be done around here. Last night, this magic happened:
sink wall of powder room (tile is level, photographer: not so steady) |
Just a reminder of the before:
In case you're wondering, that's a wooden paper towel dispenser under the window. It was recessed into the wall. I removed it. I don't really think there's anything else I can say about that.
We have removed the sink and are replacing it with something a little more substantial. Still a pedestal, since that's all that will really fit.
Here's the window wall now, in progress:
Anyway, grout goes on today. After that, the toilet comes out and the floor tile gets put down. Any guesses as to what tile I have chosen for the floor???
Back to work!
xo Meg
Great choice with the subway tiles and I like how you took them all the way to the ceiling. Ever worry you'll like the house so much when you're done that you won't want to leave? haha
ReplyDelete